top of page

Maps, Locations, Boundaries

Click              for maps of the Lift Stations relative to their locations in and around Oak Run.

This map shows some of the various structures that comprise MCU's collection system and is only a fraction of the overall collection system in its complexity and entirety.

This overhead map illustrates some of the proposed structure changes that MCU has provided to the Seniors Working Together Committee from the July 2, 2025, meeting with the Committee liaison. It is unclear as to when these changes will begin or how long it will take.
The following two maps can be magnified

This map shows, in more detail, a number of key elements that pertain to the current and projected growth, the expanded service area, and the included and excluded residential and commercial communities as a part of MCU's SW wastewater reclamation expansion project.

MCU SW Expansion ID map.png
This slideshow depicts the renderings provided by MCU for potential noise and odor mitigation efforts.
As discussed in the last meeting with MCU, April 28, 2025, this concept idea was proposed. It includes the addition of a 2-foot berm, a 6-foot fence on top of the berm, and bamboo plantings in front of the fencing. MCU assured us that they (MCU) would be responsible for the installation of the fencing and the planting of the bamboo as well as any maintenance, repairs, and upkeep needed. 
Unity in Community

© 2026 by Seniors Working Together. All rights reserved. 

bottom of page